Simpler
Than
You Think

We’ve helped hundreds of families get into a Smart Nest Home. The process is clear, the timeline is published, and nothing is hidden. Here’s exactly what happens — step by step.

1
Browse models & get a quote Day 1
2
Confirm order & financing Week 1–2
3
Production in our factory Weeks 2–12
4
Delivery to your lot Week 12–16
5
Installation — 1 to 3 days Day of delivery
🏡
You move in Done.

6

Clearsteps to your front door

8-16

Weeks average delivery time

24h

Quote turnaround after your inquiry

1-3

Days to install on your lot

2

Languages — English
& Spanish throughout

Every Step, From Start to Move-In

We've removed every unnecessary step. What's left is what it actually takes — and we walk you through every one of them.

Step 01 — Day 1

Browse & Choose Your Model

Everything you need to make a decision is already on our website — sizes, layouts, finishes, and prices. No appointment, no "call for pricing." Browse on your own time.

  • 7 models from $42K to $98K — all prices published
  • Filter by bedrooms, size, type, or availability
  • Compare all specs in one table
  • Photos of exterior, interior, and factory
Takes 10–20 minutes
Done online
Step 1
Step 2
Step 02 — Within 24 Hours

Get Your Custom Quote

Fill out a short form with your ZIP code, chosen model, and any customization requests. We send a detailed quote within one business day — itemized, with delivery cost included.

  • Model base price + delivery to your ZIP code
  • Any customizations quoted separately
  • Estimated timeline for your specific order
  • Financing options if requested
Response in 24 hrs
English or Spanish
No obligation
Step 03 — Week 1 to 2

Confirm Your Order & Financing

Once you're happy with the quote, you confirm the order with a deposit. If you're financing, this is when we connect you with our lending partners to get you approved.

  • Deposit to lock in your production slot
  • Financing application (if applicable) — response in 3–5 days
  • Final spec sheet signed off — your exact configuration locked in
  • Production start date confirmed in writing
Deposit required
Multiple financing options
Step 3
Step 4
Step 04 — Weeks 2 to 12

Your Home Is Built in Our Factory

This is where the real work happens — and where our quality system earns its keep. Your home is built from the ground up in a controlled factory environment using digital production processes.

Factory production line
  • Steel frame welded and inspected
  • Insulated panels installed
  • Electrical wiring — international standards
  • Plumbing and fixtures installed
  • Interior finishes, flooring, cabinetry
  • Quality inspection before packaging
6–14 weeks production
Digital QC every stage
Step 05 — Week 12 to 16

Delivery to Your Lot

Once your home passes final inspection, it's packaged for transport and shipped directly to your property. We coordinate logistics and keep you updated throughout.

Loading home for transport
  • Final inspection before loading
  • Packaged for safe long-distance transport
  • Delivery scheduled to your ZIP code
  • You're notified of exact delivery date
Delivered to your ZIP
Inspected before shipping
Step 5
Move In 🏡
Step 06 — Day of Delivery

Installation & Move-In Day

Your Smart Nest Home arrives on-site and is set in place. Installation takes 1–3 days depending on the model and your foundation type. After a final walkthrough — it's yours.

Installed Smart Nest project
  • Home placed on your prepared foundation
  • Utility connections made (water, electric)
  • Final walkthrough with you
  • Keys handed over — you're home
1–3 days on-site
✓ Move-in ready

ROLES

What You Handle vs. What We Handle

We take on the hard parts. Your job is to pick what you want and tell us where it’s going.

Your Responsbilities

Simple decisions, not hard labor

VS

What We Take Care Of

Everything complicated — that's ours

BUILT RIGHT

Factory Precision.
Not Contractor Guesswork.

Every Smart Nest Home is built in a controlled factory environment — not on a job site where weather, subcontractors, and scheduling delays pile up. Our digital production process means your home is inspected at every stage before it ever leaves the factory floor.

FAQ

Process Questions,
Answered Directly

The questions we get asked before someone commits — answered honestly.

In most US counties and cities, yes — a permit is required. Rules vary widely depending on your location, zoning classification, and whether the home will be a primary residence or ADU. We help you understand your local requirements before you commit to an order, and we can guide you through the permit process in most states. Contact us with your ZIP code and we’ll give you a realistic picture for your area.

Foundation requirements depend on your model, soil type, and local building codes. Common options include pier foundations, concrete slab, and steel chassis. We’ll specify the exact requirements for your chosen model in your quote. You arrange the foundation preparation; we handle everything else.

Our factory fully supports OEM/ODM customization — layouts, room configurations, exterior finishes, window placement, and internal fixtures. Custom orders are quoted separately and add 2–4 weeks to the production timeline. The more specific you are in your request, the more accurately we can quote it.

All Smart Nest Homes come with a structural warranty. For rental units, we cover structural and mechanical issues — just contact us and we dispatch. For purchased units, our warranty covers structural defects and system failures within the warranty period. We’ll clarify the exact terms in your purchase agreement.

We don’t currently have permanent showroom locations in every state, but we do have installations you can visit in some areas. Contact us with your location — we’ll let you know if there’s a completed unit near you that we can arrange a visit to. We also provide detailed photo galleries, interior walkthrough photos, and video content for every model.

Because your home is built from the same spec sheet, by the same factory team, using the same materials shown in our photos. We don’t outsource manufacturing. Every unit goes through digital quality control and a final inspection before shipping. Your purchase agreement includes the exact spec sheet — we’re legally committed to delivering what’s on it.

READY WHEN YOU ARE

The First Step Takes
Less Than 5 Minutes

Fill out our quote form with your ZIP code and chosen model. We’ll come back to you with a full quote within 24 hours — no pressure, no callbacks.

Se habla español — llámanos, enviamos un mensaje, o escríbenos. Estamos aquí.